Portfolio
Kitchens
For this project we:
- Removed the old tiles
- Plastered the walls
- Cut and installed the new tiles




Renovation
For this kitchen renovation, we:
- removed the existing flooring and wall tiles, prepped the surfaces, and installed new wall and floor tiles,
- painted and plastered the walls and ceilings,
- installed the kitchen furniture




Bed Room
For this project we:
- removed the existing kitchen floor
- added room details in drywall
- levelled the subfloor and installed a new wooden floor




Altbau
Our clients were moving into this apartment, which needed a facelift. So we:
- Plastered, sanded, and painted the walls and ceilings in the hallway and added a door
- Redesigned the closet, covered the vertical pipes with drywall, and plastered and painted it all
- Covered the old parquet with a new laminate floor
- Removed the radiators, plastered and painted walls and ceilings in all the rooms








Customisation
Our client wanted to optimize an existing wall niche, so we redesigned it into a closet:
- First, we removed all existing material
- Then we cut a wooden box to size to fit the space exactly
- And then we cut and installed the shelves




Floors
For this floor-tiling job, the team:
- measured the spaces and pre-cut tiles as necessary (for edges, and corners),
- prepped the subfloor,
- mixed and laid the thin-set mortar,
- then, laid out the tiles with spacers.
- and finally filled in the grout, sealed and caulked the joints as necessary







