Floors
For this floor tile job, the team:
- Measured the spacing and pre-cut tiles as needed (for edges and corners)
- Prepared the subfloor
- Mixed and laid the thin-set mortar
- Then, the tiles are laid out with spacers
- Finally, the grout is filled in, sealed, and the joints are caulked as needed
A good result can be recognized by the fact that the customer has nothing more to say – except thank you.
PROFESSIONAL TEAM





